Get it right before you make 2,000.

Briefs from what customers actually said, samples and quotes on the approved version, every change traced to everyone it touches, and complaints tied to the lot that shipped. Built on the PLM and tools you have, then run with you or handed over.

Led by operators who’ve built commerce and factory systems at Joybird and product organizations at Fashion Nova.

A product is a thousand decisions on one version.

Every jacket starts as a customer problem and ends as 2,000 units. In between, briefs, samples, quotes and tests all have to point at the same version, and what customers say afterward has to find its way back.

Reviews, returns, sample comments, supplier quotes, lab tests and fit sessions flow into one product record, then on to production, with customer feedback looping back to the start.ReviewsReturnsSample commentsSupplier quotesLab testsFit sessionsOne product recordProductionFeedback

Deciding what to make

Merchandising & commercial planning

Developing it

Product development & quality · this page

Making and shipping it

Supply chain & fulfillment

How product development changed

Every product lived in someone’s inbox.In PDFs, samples and memory.

Tech packs lived in Illustrator and spreadsheets, quotes in email and fit notes in meetings. Every question got a physical sample, and the only record of what was decided was somebody’s memory.

Then the tools learned to read the pack.Drawings, quotes and complaints, summarized.

PLM vendors now read drawings into bills of materials and summarize and compare documents inside the system. 3D sampling matured for carryover styles. Reading the paperwork stopped being the hard part.

So the edge moved to the right version.One revision, from brief to complaint.

An attractive image, a specified product, a tested sample and a released design are different things. The edge is knowing which revision is true, who owns each field, and which lot a complaint came from.

Skip the walkthrough

Look inside.Six views of one product record.

  1. Your products.Every revision, and who approved it.

    Revisions, suppliers, materials and what customers say, in one record. The truth no single tool holds, and the core every other part reads from.

  2. Briefs.What to make, from what customers said.

    Reviews, returns and support questions are grouped by problem and written into a brief with its sources and open questions. A person decides what gets made.

  3. Samples.One revision per round.

    Each sample is measured against target and tolerance for the revision it belongs to. When a point is out, the patternmaker gets a proposed fix, and nothing changes automatically.

  4. Suppliers.Quotes on the approved version.

    Each quote is checked against the approved revision, material and tests before anyone reads the price. A change to any of them reaches every owner, and each one acknowledges.

  5. Release.Complete before the factory starts.

    The handoff package is built from approved records and checked for gaps. The factory confirms it has the current version before the first cut.

  6. Quality.Complaints per 1,000, by lot.

    Complaints are classified, joined to the revision and lot that shipped and counted against units sold. A lot that crosses the line opens a case with an owner.

Built in your tools.Yours to keep, whoever runs it.

Your product records, rules and playbooks live in the PLM and accounts you control. If we ever part ways, the system stays.

Twelve weeks to the jacket, and the month after.

Fernway’s Canvas field jacket, developed about twelve weeks before its launch. Here is the system at work, from the first customer question to the month after it shipped.

  1. Week 1

    Forty-one people asked if the last jacket survives a wash.

    The returns said it didn’t. Brief FJ-214-B01 was written from their words, with the sources linked and the open questions still open.

    AI
    Groups questions and returns by problem
    Rules
    Every line links to its source
    Your team
    Chooses what to make
    Use caseTurn customer evidence into product briefs worth testing
    Brief FJ-214-B01Canvas field jacket

    A field jacket that survives a home wash.

    Why
    41 “machine washable?” questions and wash-related returns
    Target
    Machine washable on cold, fit unchanged
    Sources
    Questions, returns and reviews, linked
    Open
    Which canvas weight survives a wash?
    Not in scope
    Waterproof
  2. Week 3

    Sample S02 came back 1.2 cm too big.

    Every fit comment was tied to revision D and checked against its tolerance. The patternmaker got a proposed revision E, and nothing was approved automatically.

    AI
    Lists likely causes and similar past fixes
    Rules
    Measures each point against its tolerance
    Your team
    Patternmaker approves the fix
    Use caseTurn fit comments into the next revision
    Fit comments · sample S02Revision D
    CommentChecked againstResult
    Chest is roomyHalf chest 55.2, target 54.0 ±0.50.7 cm over limit
    Body feels longBody length 72.3, target 72.0 ±0.7Within
    Sleeves feel shortSleeve length 64.8, target 65.0 ±0.7Within
    Shoulders look fineShoulder width 46.2, target 46.0 ±0.5Within
    Proposed fixRevision E: take 1.2 cm out of the half chestWaiting for the patternmaker
  3. Week 4

    The cheaper quote was for a different jacket.

    Q07 cited revision C and a 10 oz canvas nobody had washed. The system flagged the mismatch and asked for a like-for-like quote on revision D.

    AI
    Reads each quote against the approved spec
    Rules
    Compares revision, material, price and units
    Your team
    Sourcing asks for a quote on D
    Use caseCompare supplier quotes against the approved spec
    Quote Q07 against the approved specHeld
    CheckApproved specQuote Q07Result
    RevisionDCDifferent
    Canvas weight12 oz10 ozDifferent
    Wash testPassed on coldNone on fileMissing
    Lead time30 days30 daysSame

    Not like for like. Fernway asks for a quote on revision D

Cheaper quote. Different jacket.

Two quotes the inbox shows side by side. Switch views to see what each jacket would really cost.

Whose view

Quote Q06

Canvas field jacket · received week 2

Lead time30 daysUnchanged

Quoted priceReal cost per jacket

  • Quoted price$31.20
  • Wash test and reworkNot shared$0
  • Expected returnsNot shared$0.40
Price a unitBuilt to
$31.20Revision D
MinimumCanvas
60012 oz, wash tested

Costs moreApprove

Quote Q07

Canvas field jacket · received week 4

Lead time30 daysUnchanged

Quoted priceReal cost per jacket

  • Quoted price$28.40
  • Wash test and reworkNot shared$2.10
  • Expected returnsNot shared$4.60
Price a unitBuilt to
$28.40Revision C
MinimumCanvas
50010 oz, never washed

Lowest priceRe-quote on revision D

How many of your quotes are for the version you approved?

A development review checks, on your own products and suppliers, in two to four weeks.

  1. Week 6

    The wash test failed on the lighter canvas.

    Fernway stayed on 12 oz. The decision went to the factory, the mill, costing, the studio and the catalog, and each one acknowledged it. “Machine washable” stayed true.

    AI
    Finds every record the fabric appears in
    Rules
    Tracks who has acknowledged
    Your team
    Development releases the decision
    Use caseTrace a specification change to everyone it touches
    Decision · stay on 12 oz canvasWeek 6
    • FactoryQuote Q06 stands, on revision D$31.20Acknowledged
    • Canvas millMill spec revision 2 stands12 ozAcknowledged
    • CostingCost plan moves from $28.40 to $31.20+$2.80Acknowledged
    • StudioShot list matches the 12 oz canvasNo reshootAcknowledged
    • Catalog“Machine washable” on cold stays trueKeptAcknowledged

    5 of 5 acknowledged

  2. Week 8

    The handoff package was complete before the factory started.

    Revision E, the approved sample, the wash tests and the import certificate evidence for the broker were in one package. Production started on the right version.

    AI
    Reads the package for gaps and conflicts
    Rules
    Checks every item against revision E
    Your team
    Development signs it, the factory confirms
    Use caseHand off a complete production package
    Handoff package · CAT-042

    12of 12 handoff items complete

    • Tech pack, revision EApproved
    • Approved sample S03Half chest within tolerance
    • Wash and shrink tests, 12 oz canvasPassed on cold
    • Quote Q06 confirmed on revision E
    • Import certificate evidenceLinked for the broker
  3. Week 16

    Twenty-four complaints, and one lot behind 21 of them.

    Shrinking after washing came to 12 per 1,000 shipped, and 31 per 1,000 in lot 3, which used a substitute thread. A corrective action switched the thread back, and lot 4 is being watched.

    AI
    Classifies each complaint
    Rules
    Joins it to its revision and lot
    Your team
    Quality owns the corrective action
    Use caseTie every complaint to the revision and lot that shipped
    Shrinks after washing · by lot24 complaints · 2,000 shipped
    LotThreadComplaintsPer 1,000
    Lot 1Approved11.5
    Lot 2Approved23.0
    Lot 3Substitute2131
    All three lots—2412
    Lot 4Approved—Watching

Every part, job by job. Start with one, or build the whole development engine.

All 12 use cases

Built around your team. Whatever it looks like today.

Your setup

You’re developing products between everything else.

What we usually find

  • Illustrator
  • Spreadsheets
  • Email
  • The factory’s expertise

Where it falls back on people

Fit notes, quotes and test reports sit in email threads, and the real status lives in your head.

What we’d do

We set up one product record and the checks around it, run it for you, and hand it over when you hire.

  1. Design
  2. Build
  3. Run

A few developers, a tech-pack tool and a lot of tracking sheets.

What we usually find

  • A tech-pack tool
  • Sample tracking sheets
  • Email
  • Shopify

Where it falls back on people

Sample status, quotes and test results are tracked by hand, and each sheet disagrees with the next.

What we’d do

We tie samples, quotes and tests to one revision and train the team to run it.

  1. Design
  2. Build
  3. Equip

Centric or FlexPLM, with its AI features not yet switched on.

What we usually find

  • Centric PLM or FlexPLM
  • Suppliers by email
  • NetSuite

Where it falls back on people

The PLM holds the pack. Quotes, tests and complaints still live outside it, and nothing joins them to a revision.

What we’d do

We test what the PLM’s own AI does on your edition first, then add only the joins and checks it doesn’t make.

  1. Design
  2. Build
  3. Equip

The factory or contract manufacturer holds the patterns or formulas.

What we usually find

  • Factory-held patterns
  • Supplier PDFs
  • Email

Where it falls back on people

The know-how lives with the supplier. You see PDFs, and a change takes a call to reach the right person.

What we’d do

We bring the specs, fixes and approvals into your own records, and keep the factory as the partner who confirms each change.

  1. Design
  2. Build
  3. Run

Yours to keep. Whoever runs it.

If your factory or PLM vendor disappeared tomorrow, would your team still know which revision is true?

When the engagement ends, with
What leaves
The patterns, the fixes and what the supplier knows.
What stays
The PDFs.
What leaves
The configuration and the field rules.
What stays
An export of records.
What leaves
Nothing.
What stays
All of it: in your accounts, documented, with your team trained to run it.
  1. Design

    The system, mapped to your products, suppliers and team.

  2. Build

    In your PLM and tools, connected and documented.

  3. Run it, or hand it over

    We run it with you, or train your team and step back.

Fixed fees to design and build. Monthly to run, with part of the fee tied to agreed targets where the numbers support it.

We’ve built product systems down to the factory floor.

Our operators have built commerce, merchandising, supply-chain and factory systems at Joybird, and led a product and design organization at Fashion Nova. We know where the weeks go between a brief and a first run.

  • Joybird First product hire. Built a 19-person product, UX and engineering organization as annual digital revenue grew from $20M to $110M. The work included commerce, merchandising, supply-chain and factory systems.
  • Fashion Nova Led a multi-level product and design organization in a business with more than $2B in annual revenue.
About the team

Start with a development review. See where the hours go.

Fernway’s development hours last season, sorted by the work they went to

670 h

Design and decisions

210 h

Work only your team can do

  • Fit sessions120 h
  • Brief and concept work90 h

Testing and approvals

130 h

Needed, and slowed by waiting

  • Wash and lab tests70 h
  • Sample reviews60 h

Chasing and reconciling

330 h

Finding the current version of something

  • Chasing samples140 h
  • Reconciling versions110 h
  • Re-quotes80 h

330 h a season, 49% of development time, spent chasing samples and versions. The review finds which of it a system should carry.

Two to four weeks. A plan that’s yours.

We follow one product from brief to complaint, find where it left the approved version, and map the engine you need. Every opportunity is sized and given a verdict: do first, validate, defer or leave alone.

  • Two to four weeks
  • Fixed fee, quoted after a short call, credited in full if we build it
  • The plan is yours, whoever builds it
  • The findings are yours whether or not we build

Make it right before you make it. Start with a development review.

We reply within one business day.