Keep samples, tests and production readiness moving.
One register of every sample, test and quote by revision, so blockers show up with an owner before they move a date.
Sound familiar?
- Nobody can say which sample is the current one.
- Fit comments, revisions and test reports live in different documents.
- Production is working to a date that moved two weeks ago.
Seasonal dates slip, sample invoices pile up and the team spends its time chasing instead of deciding.
What changes.
- Status
- Asked for by email and in meetingsOne register by revision, always current
- Comments
- In PDFs, photos and chatTied to the revision and sample they’re about
- Evidence
- A task marked doneA test report attached to the revision
- Dates
- Production works from an old dateDates move for everyone when a blocker does
How it works. 5 steps, 5 stages.
- AI1
- Rules and automation2
- Your team2
- Approval
1Define
Your teamApproval
Define readiness
Name the revision, the tests it needs and who may approve each one.
2Connect
Rules and automation
Connect samples and evidence
Sample moves, comments and test reports join the revision they belong to.
- Techpacker
- FlexPLM
- Centric PLM
3Surface
AI
Surface blockers
Finds missing reports, conflicting revisions and decisions that move the date.
4Propagate
Rules and automation
Send changes to who they touch
Revised specs and dates reach sourcing, the factory, the studio and the catalog.
5Confirm
Your teamApproval
Confirm the handoff
The development lead signs off, and production confirms it has the current package.
Closed blockers move the dates
What you get. Real work, every week.
| Item | Revision | Owner | Status |
|---|---|---|---|
| Fit sample S02 | D | Patternmaker | 0.7 cm over limit |
| Wash test, 12 oz canvas | D | Wash lab | Passed, report due |
| Quote Q06 | D | Sourcing | Received |
| Quote Q07 | C | Sourcing | Wrong revision |
| Import certificate evidence | — | Quality lead | Not started |
The register the whole team works from: every sample, test and quote against the revision it belongs to.
- Wash report, 12 oz canvasWash lab · test passed, report not yet issued6 daysChase
- Revision E approvalPatternmaker · fit fix after S023 daysDecide
- Import certificate evidenceQuality lead · no test report linkedOpenLink
Blockers by age, each with an owner. A task marked done doesn’t count until the test report is attached.
How you’ll know it’s working.
Age of blockers and missing approvals
The clearest sign of which part of development is stuck.
Hours spent chasing samples and reconciling versions
Time that should go to decisions, counted by your own team.
Production handoffs that are complete on first send
A late find at the factory is a gap the register should have shown.
Baselines agreed before we build.
- Fit sessions and briefs
- 210 h
- Wash and lab tests, sample reviews
- 130 h
- Chasing samples
- 140 h
- Reconciling versions
- 110 h
- Re-quotes
- 80 h
- Chasing and reconciling
- 330 of 670 h
Fernway’s last season, counted in hours of capacity. Hours recovered are capacity, and become cash only if spending falls.
Works with what you have.
PLM & specs
- FlexPLM
- Centric PLM
- Arena
- Techpacker
- Specright
Commerce
- NetSuite
- We configure first
- If you have a PLM, we check what its own AI and workflows already do on your edition before we build anything beside it.
- We build when
- Samples, tests and quotes live in different tools and nothing joins them by revision.
What a first build includes.
Built in your accounts, around your team. Scope, fee and baseline agreed before we start.
- 1Design
- 2Build
- 3Run it, or hand it over
We build
- A readiness register keyed by revision
- Blocker ages and owners, updated from your tools
- Date changes sent to everyone who plans around them
- A source-linked production-readiness package
We start from
- Tech packs and revision history
- Sample and test records
- Supplier milestones and approval rules
From your team
- Owner
- Product development lead
- Involves
- Development
- Design
- Quality
- Sourcing
- Factory partner
- Studio
- Catalog
Questions teams ask.
We already have a PLM. Is this a second system?
No. The PLM stays the record of the product. PLM vendors now read drawings and summarize documents inside it, and we use that first. We add the joins it doesn’t make, like samples, quotes and tests on one revision.
Does it decide when a product is ready?
No. It shows what’s missing and who owns it. Test, engineering and compliance decisions stay with the people qualified to make them.
Who owns it once it’s running?
You do. It’s built in your accounts, documented, with training for the people who run it. Ownership usually sits with your product development lead. We can keep running it with you, or step back.
How do we start?
Usually with a development review: two to four weeks, a fixed fee credited to the build, and a plan that’s yours. If the job is already clear, we can scope the build directly.
Part of your development engine. One of 12 use cases, in 5 parts.
See the whole development engineIn specs & samples
Know what’s holding up the next sample. Start with a development review.
We reply within one business day.